Awci Technical Manual 12-b

Intumescent coating testing is conducted in accordance with AWCI Technical Manual 12-B. Firestopping Review All penetrations and joints in a fire separation are required to be sealed utilizing a cUL/ULC approved firestop design. Technical Manual 12-B Standard Practice for the Testing and Inspection of Field Applied Thin-Film Intumescent Fire-Resistive Materials Association of the Wall and Ceiling Industry (AWCI) on Amazon.com.FREE. shipping on qualifying offers. Technical Manual 12-B Standard Practice for the Testing and Inspection of Field Applied Thin-Film Intumescent Fire-Resistive Materials.

AWCI Technical Manual B, “Standard Practice for the Testing and Inspection of. Field Applied Thin-Film Intumescent Fire-Resistive Materials. Provides field inspection procedures for the testing of thin-film intumescent fire- resistive materials. Includes testing criteria for thickness measurement of applied . AWCI Technical Manual B, Standard Practice for the Testing and Inspection of Field Applied Thin-Film Intumescent Fire-Resistive Materials; an Annotated.

Author:Voramar Fenrigrel
Country:Zambia
Language:English (Spanish)
Genre:Spiritual
Published (Last):13 September 2018
Pages:58
PDF File Size:8.62 Mb
ePub File Size:1.87 Mb
ISBN:250-1-93360-528-3
Downloads:31786
Price:Free* [*Free Regsitration Required]
Uploader:Kazihn

Packaged materials must bear the appropriate labels, seals and designated certification mark for fire resistive ratings. Approved by the factory manufactured architectural fire protection material manufacturer and applied in accordance with the topcoat manufacturer’s documented instructions. All products listed in this section must be manufactured manua the appropriate follow-up service with each container bearing the certified label mark.

International Protective Coatings is the leading supplier of high performance Protective Coatings and forms part of Akzo Nobel, a market driven, technology based company specializing in Coatings, Chemicals and Pharmaceuticals.

AWCI’s Construction Dimensions – October 2013

Verify that all clip hangers, manial, ducts, equipment or other items which would interfere with the installation of the factory-manufactured architectural fire protection system are not positioned or installed until installation is complete. Delete paragraphs not applicable.

Company specializing in installing the work of this section with a minimum of three years documented experience and certified by the material manufacturer.

Technical

Temperature and Humidity Requirements: The relative humidity of the application area shall not exceed a maximum of 85 percent for 24 hours prior, during and 24 hours after the application of the material. Submit plan, section, elevation and perspective drawings as necessary to depict system configuration, design considerations and application procedures. The application awfi be witnessed by the Architect’s or Owner’s representative and is subject to their approval.

Provide a mock-up for evaluation of surface preparation techniques and application workmanship. Final color, gloss and finish will be determined and approved by the Architect.

Technical Manual 12-B

Fire Resistive Directory, Volume 1; Current edition. Thickness determinations shall be made at nine locations around the beam, at each end of a in. Submit applicator’s current certification as a manufacturer trained and approved installer. This section is based on the products of International Protective Coatings, which is located at:.

That’s where reading the earlier material comes in handy. Do not commence installation of the factory manufactured architectural fire protection system until the contractor, installer and inspector have examined the surfaces to receive the fire protection and determined the surfaces are acceptable to receive the fire protection material. A copy of the transport document and manufacturers conformance certificate shall be attached to the material 12-n QC form. When I first encountered this instruction many years tecunical, I happened to be observing a fire test of a new formulation of an intumescent coating in a small-scale furnace conducted by asci of our manufacturer members.

What could have caused this, and how do we avoid it recurring? Sample frequency will waci pre-determined by the architect and testing performed by an independent testing laboratory or the factory-manufactured architectural fire protection manufacturer.

SECTION ARCHITECTURAL INTUMESCENT FIRE PROTECTION

Maintain air temperature and relative humidity in areas where products technnical be applied for a time period before during and after application as recommended by manufacturer.

The magic drawing was a crude 3-dimensional image of an I-beam showing some of the nine points to be measured and then, swci inches further techincal the beam, was another set of points to be tested. The following is one example of how a mock-up on a large project might be specified. Interchar is primarily a spray applied material, and performs without the requirement for any reinforcement. If necessary for job schedule, the General Contractor shall provide enclosures and heat to maintain proper temperatures and humidity levels in the application areas.

The use of a bonding agent may also improve the bond of portland cement plaster applied over relatively slick concrete, but the literature warns that one should ensure that it is an exterior grade bonding agent because a cheaper interior grade of bonding agent may not provide adequate bond.

Upon completion of installation, all excess material, overspray and debris must be cleared and removed from the job site. Architectural Fire Protection Factory Manufacturer: Provide masking, drop cloths or other suitable coverings to prevent overspray onto awcl not intended to be affected by Work in this section.

Jones is AWCI’s director of technical services. Delete options for Application not required for project.

Store and dispose of hazardous materials, and materials contaminated by hazardous materials, in accordance with requirements of local authorities having jurisdiction. Deliver materials in manufacturer’s original, sealed, undamaged container with identification label intact.

12-b

Awci Technical Manual 12 B Pdf

All batch number, product identification and quantities shall be recorded on appropriate QC documents. A pair of measurements 12 inches apart on a given beam in no particular, random location along the beam — the tested area could be near an end or in the middle of the span.

Related Posts

AWCI TECHNICAL MANUAL 12-B PDF

  • July 31, 2019

Awci 12 B Technical Manual

AWCI Technical Manual B, “Standard Practice for the Testing and Inspection of. Field Applied Thin-Film Intumescent Fire-Resistive Materials. Provides field inspection procedures for the testing of thin-film intumescent fire- resistive materials. Includes testing criteria for thickness measurement of applied . AWCI Technical Manual B, Standard Practice for the Testing and Inspection of Field Applied Thin-Film Intumescent Fire-Resistive Materials; an Annotated.

Author:Fenrirn Malarr
Country:Equatorial Guinea
Language:English (Spanish)
Genre:Literature
Published (Last):1 August 2011
Pages:85
PDF File Size:18.58 Mb
ePub File Size:14.23 Mb
ISBN:901-2-96682-846-2
Downloads:5313
Price:Free* [*Free Regsitration Required]
Uploader:Vudosida

Once agreed upon in writing, it serves as a guide for the finished work. Install factory-manufactured architectural fire protection material only to primed surfaces and in accordance with manufacturer’s installation instructions. The concrete could also have been considerably drier than the portland cement plaster when it was applied and absorbed too much of the moisture from the mix to ensure proper curing.

Fire Resistive Directory, Volume 1; Current edition. The use of a bonding agent may also improve the bond of portland cement plaster applied over relatively slick concrete, but the literature warns that one should ensure that it is an exterior grade bonding agent because a cheaper interior grade of bonding agent may not provide adequate bond.

Company specializing in installing the work of this section with a minimum of three years documented experience and certified by the material manufacturer. The fire protection material inspection must be performed prior to the application of the decorative top coat. Grind smooth all weld spatter and defects prior to commencement of fire protection installation.

For each finish product specified, a set of factory-manufactured architectural fire protection samples representing manufacturer’s range of available materials, finishes and shapes.

Substrate and air temperature shall be in accordance with the manufacturers requirements. If necessary for job schedule, the General Contractor shall provide enclosures and heat to maintain proper temperatures and humidity levels in the application areas.

Awci technical manual 12-b pdf

AWCI’s Construction Dimensions – October 2013

Thickness determinations shall be made at nine locations around the beam, at each end of a in. Areas will be designated by the Architect. After several failed attempts to explain this testing procedure to me I first took it to mean one must measure near each end of the beam, 12 inches inthe technical sales rep wound up drawing a diagram that finally made it clear.

Awci Technical Manual 12-b

Interchar is primarily a spray tecnnical material, and performs without the requirement for any reinforcement.

Technical Manual 12-B

The following is one example of how a mock-up on a large project might be specified. Sample frequency will be pre-determined by the architect and testing performed by an independent testing laboratory or the factory-manufactured architectural fire protection manufacturer. International Paint has operations in 54 countries worldwide and over 3, awi. Final color, gloss and finish will be determined and approved by the Architect.

Technical Manual B

Awci Technical Manual 12-b

No intumescent fireproofing or technicla material may be procured or delivered to the project site prior to the review and acceptance of the proposed materials by the Architect in writing. All test results must manul made available to all parties at the completion of each pre-designated area and approved prior to the application of top-coat. Prior to aeci Part A and B of the adhesive and edge sealant during the installation of the architectural decorative fire protection material, random pre-determined liquid samples of Part A and Part B must be submitted for material characterization fingerprinting in accordance with the procedures detailed in the ISO Standard.

Do not proceed with remaining work until workmanship, color, and sheen are approved by Architect. Store and dispose of hazardous materials, and materials contaminated by hazardous materials, in accordance with requirements of local authorities having jurisdiction. Architectural Fire Protection Factory Manufacturer: The application must be witnessed by the Architect’s or Owner’s representative and is subject to their approval.

Sequence and coordinate installation of factory-manufactured architectural fire protection system with Work in other sections which would interfere with efficient fireproofing application. Temperature and Humidity Requirements: All surfaces to receive the factory-manufactured architectural fire protection material must be clean, dry and free of oil, grease, loose mill scale, dirt, dust or other foreign substances which would technjcal bond of the architectural fire protection material to the substrate.

Architectural Fire Protection Installer: Regional Materials- 20 percent extracted, processed and manufactured regionally: Patching must be performed by the qualified installer and applied in accordance with the manufacturer’s installation instructions.

International Manuual, LLC, which is located at: Structural steel and framing with reference to primer receiving fire protection materials. Remove fire protection materials from surfaces not required to be fireproofed. Packaged materials must bear the appropriate labels, seals techmical designated certification mark for fire resistive ratings. Submit product data including manufacturer’s technical information indicating product performance characteristics, performance and limitation criteria.

What is the intended pattern? Protect adjacent areas 12-h over spray of fireproofing material. Tchnical ventilation in areas to receive work of this section during application and minimum 24 hours after application. Verify that substrate and workspace temperature and humidity conditions are in accordance with requirements of this section. Approved by the factory manufactured architectural fire protection manufacturer and applied in accordance with the primer manufacturers documented instructions.

Awci Technical Manual 12-b

What could have caused this, and how do we avoid it recurring?

Factory manufactured architectural fire protection system will be a complete system from a single source consisting of primer, factory manufactured fire protection ttechnical, section adhesive, edge sealant and decorative topcoat. A concrete surface could be too slick because it has been coated with some kind of sealer, or the forms left a tight surface that was not roughed up or otherwise pretreated before the plaster was applied.

Related Posts (10)